Environmental Commitment at Kamarajar Port

KPL is deeply committed to environmental sustainability and the highest standards of occupational safety. By integrating eco-friendly practices and strict safety protocols, KPL ensures that its operations have minimal environmental impact while safeguarding the well-being of its workforce.

From pollution control measures and waste management systems to energy-efficient infrastructure and safety training programs, KPL continuously strives to balance port operations with environmental stewardship and workplace safety. This proactive approach highlights KPL’s dedication to fostering a sustainable and safe operational environment.


Environmental Commitment

As part of its Integrated Coastal Management Plan, KPL has undertaken the stabilisation of Ennore Creek by constructing groynes to manage sand drift, with a project cost of Rs. 156 crore, executed by Public Works Department, Government of Tamil Nadu.


Environmental Excellence in Port Operations

KPL was the first major port to introduce mechanised coal handling with closed conveyor systems and water sprinklers in 2001. Its Marine Liquid Terminal, commissioned in 2009, is equipped with VOC analysers and an effluent treatment plant.

The Common User Coal Terminal uses closed conveyor systems, windshields, and sprinklers to minimise dust emissions. Clean cargo handling at the Multi Cargo Terminal and electrification of internal transport vehicles at the Container Terminal further highlight KPL’s commitment to environmental excellence in port operations.


Greenbelt Development

KPL has been enhancing its greenbelt since 2008, covering 636.14 acres, which now makes up 22.82% of its total area. This greenbelt acts as a barrier against dust, contributing to the port’s eco-friendly operations.


Environmental Monitoring and Management

Since 2008, KPL has actively monitored environmental parameters, including air and water quality. In 2023, KPL installed three continuous ambient air quality monitoring stations, synchronised with CPCB and TNPCB servers to provide real-time data. This reflects the port’s ongoing commitment to ensure a clean environment.


Green Port Initiatives & Achievements

KPL provides shore-based power for small crafts when idle alongside the jetty, further reducing carbon emissions. The port has installed a shore power supply facility for ships at Coal Berths 1 & 2, ready for commissioning.

KPL and its BOT / Captive Terminal Operators have installed sewage treatment plants with a total capacity of 83 KLD, with treated sewage being used for greenbelt maintenance. To address water needs, KPL is also installing a 1 MLD Sea Water Reverse Osmosis (SWRO) Desalination Plant for captive use.

KPL has made significant strides in renewable energy by installing a 320 KWp ground-mounted off-grid solar power plant, allowing the port to meet 50% of its energy needs through renewable sources. BOT operators have installed solar units, drawing 30% of their energy from renewable sources. As of FY 2023-24, the combined green power share for KPL and its operators is about 40%.

The port also provides reception facilities to ships under MARPOL Annex I, II, IV, V, and VI, ensuring compliance with international environmental standards.

To reduce carbon footprint, KPL has introduced electric vehicles for solid waste management within the port and implemented a ban on single-use plastics in its premises.


Health & Safety at Kamarajar Port

KPL adheres to the Dock Workers Act, 1986, ensuring high safety standards for employees and workers. This includes regular safety training, medical checkups, mock drills, safety audits, inspections, and committee meetings to promote a strong safety culture within the port.

KPL and its BOT / Captive Terminal Operators have well-established fire prevention and safety protocols, regularly monitored through audits and inspections. The port is equipped with adequate fixed and portable firefighting facilities such as fire tender, fire hydrants, fire water cum foam monitors, tower monitors, sprinklers, smoke detectors, and fire alarm systems.

The port maintains a 24/7 ambulance and occupational health centre, staffed with certified personnel and a medical practitioner during working hours.

KPL also has a comprehensive Disaster and Crisis Management Plan in place, ensuring personnel are well-trained for emergencies through frequent drills and skill development programs.

Sustainability & Environment

Overview of ‘Sustainability & Environment’:

Kamarajar Port Limited (KPL) is committed to sustainable and responsible port operations while minimizing environmental impacts and protecting the coastal and marine ecosystem. The Port integrates environmental management practices into its planning, construction, and operational activities in compliance with statutory requirements and international best practices.

KPL undertakes continuous monitoring and improvement measures related to air and water quality, waste management, biodiversity conservation, energy efficiency, and climate action. The Port actively promotes green initiatives, resource efficiency, and stakeholder engagement to support sustainable development of port infrastructure and surrounding communities.


1. Environmental Policy & Commitment

Kamarajar Port Limited (KPL) is committed to sustainable port development and environmentally responsible operations. The Port recognizes its responsibility to protect the coastal and marine environment, minimize environmental impacts, and promote resource-efficient and climate-resilient port infrastructure in line with national regulations and international best practices.

KPL integrates environmental considerations into all stages of planning, development, and operational activities and strives for continual improvement in environmental performance.

Policy Document: (Upload policy document here)


2. Environmental Management Cell (EMC)

Kamarajar Port Limited has established an Environmental Management Cell (EMC) to ensure effective implementation of environmental policies, statutory compliance, and continual improvement in environmental performance across port operations.

The EMC functions as the nodal unit for environmental planning, monitoring, compliance, and coordination with regulatory authorities, port users, and stakeholders. It oversees environmental management during project development, construction, and operational phases in line with Environmental Clearance (EC) conditions, Consent to Operate (CTO) requirements, and applicable environmental regulations.

Structure of EMC with Designations: (Upload structure document here)


3. Environmental Management Plan (EMP)

Kamarajar Port Limited has developed and implemented an Environmental Management Plan (EMP) to ensure systematic identification, monitoring, and mitigation of environmental impacts arising from port development and operational activities. The EMP is prepared in line with the conditions stipulated in Environmental Clearance (EC), Coastal Regulation Zone (CRZ) clearance, Consent to Operate (CTO), and applicable environmental regulations and guidelines.

The EMP provides a structured framework for pollution prevention, resource efficiency, environmental monitoring, and continual improvement in environmental performance.


4. CRZ & Environmental Clearances

Kamarajar Port Limited undertakes port development and operational activities in compliance with the provisions of the Environment (Protection) Act, 1986, EIA Notification, 2006 (as amended), and Coastal Regulation Zone (CRZ) Notification issued by the Ministry of Environment, Forest and Climate Change (MoEF&CC), Government of India.

The Port has obtained the requisite Environmental Clearance (EC) and CRZ Clearance for its port infrastructure and expansion projects from the competent authorities. KPL ensures that all stipulated conditions in the approvals are implemented during project planning, construction, and operation phases.

The port has obtained the following CRZ & Environmental Clearances for its projects as on date.

S.NoDescription of ClearanceDate of Accordance & AuthorityStatus of Implementation
1
2

Consent Orders

Kamarajar Port Limited operates its port facilities in compliance with the provisions of the Water (Prevention and Control of Pollution) Act, 1974 and the Air (Prevention and Control of Pollution) Act, 1981, and the rules framed thereunder.

The Port has obtained the required Consent to Establish (CTE) and Consent to Operate (CTO) from the Tamil Nadu Pollution Control Board (TNPCB) for its port infrastructure and operational activities.

a) Consent to Establish (CTE)

CTE is obtained from TNPCB prior to the establishment of port infrastructure and allied facilities, ensuring that environmental safeguards are incorporated at the design and construction stages.

The port has obtained the following CTEs for its projects as on date.

S.NoDescription of ClearanceDate of Accordance & AuthorityStatus of Implementation
1
2
b) Consent to Operate (CTO)

CTO is obtained and periodically renewed for operational facilities, terminals, utilities, and infrastructure within the port. KPL ensures compliance with the conditions stipulated in the consent orders, including pollution control measures, environmental monitoring, and reporting requirements.

The port has obtained the following CTOs for its projects as on date.

S.NoDescription of ClearanceDate of Accordance & AuthorityStatus of Implementation
1
2

5. Environmental Compliance Reports
I. Half-Yearly Environmental Compliance Reports

KPL submits half-yearly compliance reports to the Ministry of Environment, Forest and Climate Change (MoEF&CC) and other regulatory authorities as required under the Environmental Clearance conditions. The reports include:

a) Status of implementation of EC and CRZ conditions

b) Ambient air and water quality monitoring results

c) Noise and soil monitoring results

d) Green belt development and biodiversity initiatives

e) Waste management and pollution control measures

f) Community and CSR-linked environmental initiatives

Half yearly environmental compliance reports of the Port

S.NoDescription of ReportPeriod of ComplianceDate of Submission to MoEF&CC
1
2
II. Consent Compliance Reports to TNPCB

Periodic compliance submissions are made to the Tamil Nadu Pollution Control Board in line with Consent to Operate conditions, covering:

a) Air and water pollution control measures

b) Waste handling and disposal practices

c) Monitoring results and laboratory analysis reports

d) Compliance with consent stipulations

e) Environmental Monitoring Reports

f) Biodiversity & Green Cover

g) Solid & Hazardous Waste Management

h) Port Reception Facilities under MARPOL 73/78.

i) Half yearly environmental compliance reports of the Port

Compliance to the direction stipulated in CTOs issued to the Port

S.NoDescription of ReportPeriod of ComplianceDate of Submission to TNPCB
1
2

6. Environmental Monitoring Reports

Kamarajar Port Limited conducts periodic environmental monitoring to assess the impact of port operations and ensure compliance with statutory environmental requirements and Environmental Clearance (EC) and Consent to Operate (CTO) conditions.

Environmental monitoring is carried out through NABL-accredited laboratories and qualified agencies, and the results are reviewed by the Environmental Management Cell for compliance evaluation and implementation of corrective measures, wherever required.

Environmental Monitoring reports of the Port:

S.NoDescription of ReportPeriod of MonitoringDate of Submission to TNPCB
1
2

7. Solid & Hazardous Waste Management

Kamarajar Port Limited is committed to environmentally sound management of solid and hazardous wastes generated from port operations and associated activities. The Port follows the provisions of applicable environmental laws and rules, including the Solid Waste Management Rules, 2016, Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, and guidelines issued by the Central and State Pollution Control Boards.

KPL ensures safe handling, storage, transportation, and disposal of wastes through authorized agencies and promotes waste minimization and resource recovery practices.

Hazardous Waste returns:

Environmental Monitoring reports of the Port:

S.NoDescription of ReturnReturn PeriodDate of Submission to TNPCB
1
2

8. Biodiversity Management & Green Belt
Biodiversity Management

The project area and its surroundings support a variety of terrestrial and aquatic flora and fauna. Biodiversity management is an integral part of the Environmental Management Plan (EMP) to ensure conservation of local ecosystems and compliance with statutory requirements. Port is having Biodiversity Management Plan approved by Tamilnadu Biodiversity Board put in place.

The baseline study indicates the presence of common terrestrial vegetation, avifauna, and marine/estuarine species typical to the coastal region. No critically endangered species or protected habitats such as National Parks, Wildlife Sanctuaries, or Eco-Sensitive Zones are located within the project influence area.

To minimize impacts on biodiversity, the following measures are implemented:

 Avoidance of disturbance to natural habitats and sensitive ecological zones.

 Restriction of construction activities during sensitive breeding seasons, wherever applicable.

 Implementation of noise and dust control measures to minimize impacts on fauna.

 Prevention of oil spills, chemical leaks, and wastewater discharge into marine and terrestrial environments.

 Periodic monitoring of marine and terrestrial biodiversity through accredited agencies.

 Awareness and training programs for employees and contractors on biodiversity conservation.

Greenbelt Development

A green belt is developed within the project premises and along the periphery, roadsides, buffer zones, and vacant areas. The green belt covers approximately 23% (636.14 Acres) of the total project area of 2787 Acres.

 Preference is given to native, fast-growing, and pollution-tolerant species.

 Multi-tier plantation pattern (trees, shrubs, and grasses) is adopted to maximize ecological benefits.

 Coastal and salt-tolerant species are planted in shoreline areas.

 Landscaping is carried out along roads, administrative buildings, and open spaces.


9. Sustainability Reporting

The organization is committed to integrating sustainability principles into its business operations to achieve long-term economic growth while minimizing environmental impacts and promoting social well-being. Sustainability is embedded in corporate strategy, governance structures, and operational practices in line with national and international frameworks such as the UN Sustainable Development Goals (SDGs), ESG principles, and SEBI BRSR guidelines.

Sustainability reports of the Port

S.NoDescription of Sustainability ReportReporting PeriodType of Reporting
1
2

10. Port Reception facilities and MARPOL compliance

The Port has established Port Reception Facilities (PRF) in accordance with the requirements of the International Convention for the Prevention of Pollution from Ships (MARPOL 73/78) and the guidelines issued by the Directorate General of Shipping (DG Shipping), Government of India. The facilities are provided to receive ship-generated wastes and residues without causing undue delay to vessels.

The Port ensures that adequate, efficient, and environmentally sound facilities are available for collection, storage, treatment, and disposal of wastes generated from vessels calling at the Port.

Disclosures of the Port Reception Facilities

S.NoDescription of DocumentType of Reporting
1
2
कामराजर पोर्ट में पर्यावरणीय प्रतिबद्धता

KPL पर्यावरणीय स्थिरता और व्यावसायिक सुरक्षा के उच्चतम मानकों के प्रति गहराई से प्रतिबद्ध है। पर्यावरण के अनुकूल प्रथाओं और सख्त सुरक्षा प्रोटोकॉल को एकीकृत करके, KPL यह सुनिश्चित करता है कि उसके संचालन का पर्यावरण पर न्यूनतम प्रभाव पड़े और साथ ही उसके कार्यबल की सुरक्षा सुनिश्चित हो।

प्रदूषण नियंत्रण उपायों, अपशिष्ट प्रबंधन प्रणालियों, ऊर्जा-कुशल अवसंरचना और सुरक्षा प्रशिक्षण कार्यक्रमों के माध्यम से, KPL लगातार यह प्रयास करता है कि पोर्ट संचालन और पर्यावरण संरक्षण के बीच संतुलन बना रहे। यह सक्रिय दृष्टिकोण KPL की स्थायी और सुरक्षित परिचालन वातावरण बनाने की प्रतिबद्धता को दर्शाता है।


पर्यावरणीय प्रतिबद्धता

अपने एकीकृत तटीय प्रबंधन योजना के हिस्से के रूप में, KPL ने एन्नोर क्रीक के स्थिरीकरण के लिए रेत के बहाव को नियंत्रित करने हेतु ग्रोइन का निर्माण किया है, जिसकी परियोजना लागत ₹156 करोड़ है। यह परियोजना तमिलनाडु सरकार के लोक निर्माण विभाग द्वारा निष्पादित की गई है।


पोर्ट संचालन में पर्यावरणीय उत्कृष्टता

KPL वर्ष 2001 में बंद कन्वेयर सिस्टम और जल छिड़काव प्रणाली के साथ यंत्रीकृत कोयला हैंडलिंग शुरू करने वाला पहला प्रमुख बंदरगाह था। 2009 में शुरू किया गया इसका मरीन लिक्विड टर्मिनल VOC विश्लेषक और एफ्लुएंट ट्रीटमेंट प्लांट से सुसज्जित है।

कॉमन यूजर कोल टर्मिनल में बंद कन्वेयर सिस्टम, विंडशील्ड और स्प्रिंकलर लगाए गए हैं ताकि धूल उत्सर्जन को कम किया जा सके। मल्टी कार्गो टर्मिनल में स्वच्छ कार्गो हैंडलिंग और कंटेनर टर्मिनल में आंतरिक परिवहन वाहनों का विद्युतीकरण भी पोर्ट संचालन में पर्यावरणीय उत्कृष्टता के प्रति KPL की प्रतिबद्धता को दर्शाता है।


ग्रीन बेल्ट विकास

KPL वर्ष 2008 से अपने ग्रीन बेल्ट का विस्तार कर रहा है, जो अब 636.14 एकड़ क्षेत्र में फैला हुआ है और पोर्ट के कुल क्षेत्रफल का 22.82% भाग है। यह ग्रीन बेल्ट धूल को रोकने में बाधा का कार्य करता है और पोर्ट के पर्यावरण अनुकूल संचालन में योगदान देता है।


पर्यावरण निगरानी और प्रबंधन

वर्ष 2008 से KPL वायु और जल गुणवत्ता सहित विभिन्न पर्यावरणीय मानकों की सक्रिय रूप से निगरानी कर रहा है। वर्ष 2023 में KPL ने तीन सतत परिवेशी वायु गुणवत्ता निगरानी स्टेशन स्थापित किए, जो CPCB और TNPCB सर्वरों से समन्वित हैं और वास्तविक समय में डेटा उपलब्ध कराते हैं। यह स्वच्छ पर्यावरण सुनिश्चित करने की दिशा में पोर्ट की निरंतर प्रतिबद्धता को दर्शाता है।


ग्रीन पोर्ट पहल एवं उपलब्धियाँ

KPL जेट्टी के किनारे खड़े छोटे जहाजों को तट-आधारित बिजली उपलब्ध कराता है, जिससे कार्बन उत्सर्जन कम होता है। पोर्ट ने कोल बर्थ 1 और 2 पर जहाजों के लिए शोर पावर सप्लाई सुविधा स्थापित की है, जो चालू होने के लिए तैयार है।

KPL और उसके BOT / कैप्टिव टर्मिनल ऑपरेटरों ने 83 KLD क्षमता वाले सीवेज ट्रीटमेंट प्लांट स्थापित किए हैं, जिनसे उपचारित जल का उपयोग ग्रीन बेल्ट रखरखाव में किया जाता है। जल की आवश्यकता को पूरा करने के लिए KPL 1 MLD क्षमता वाला समुद्री जल रिवर्स ऑस्मोसिस (SWRO) डीसैलिनेशन प्लांट भी स्थापित कर रहा है।

KPL ने नवीकरणीय ऊर्जा के क्षेत्र में महत्वपूर्ण प्रगति करते हुए 320 KWp का ग्राउंड-माउंटेड ऑफ-ग्रिड सोलर पावर प्लांट स्थापित किया है, जिससे पोर्ट अपनी ऊर्जा आवश्यकताओं का 50% नवीकरणीय स्रोतों से प्राप्त कर सकता है। BOT ऑपरेटरों ने भी सोलर यूनिट स्थापित की हैं और अपनी ऊर्जा का 30% नवीकरणीय स्रोतों से प्राप्त कर रहे हैं। FY 2023-24 तक KPL और उसके ऑपरेटरों के लिए कुल हरित ऊर्जा हिस्सा लगभग 40% है।

पोर्ट MARPOL Annex I, II, IV, V और VI के अंतर्गत जहाजों के लिए रिसेप्शन सुविधाएँ भी प्रदान करता है, जिससे अंतरराष्ट्रीय पर्यावरण मानकों का अनुपालन सुनिश्चित होता है।

कार्बन फुटप्रिंट कम करने के लिए KPL ने पोर्ट परिसर में ठोस अपशिष्ट प्रबंधन के लिए इलेक्ट्रिक वाहनों की शुरुआत की है और सिंगल-यूज़ प्लास्टिक पर प्रतिबंध लागू किया है।


कामराजर पोर्ट में स्वास्थ्य एवं सुरक्षा

KPL डॉक वर्कर्स अधिनियम, 1986 का पालन करता है और कर्मचारियों एवं श्रमिकों के लिए उच्च सुरक्षा मानक सुनिश्चित करता है। इसमें नियमित सुरक्षा प्रशिक्षण, स्वास्थ्य जांच, मॉक ड्रिल, सुरक्षा ऑडिट, निरीक्षण और समिति बैठकें शामिल हैं।

KPL और उसके BOT / कैप्टिव टर्मिनल ऑपरेटरों के पास आग से बचाव और सुरक्षा के लिए सुदृढ़ व्यवस्थाएँ हैं, जिनकी नियमित रूप से ऑडिट और निरीक्षण के माध्यम से निगरानी की जाती है। पोर्ट में फायर टेंडर, फायर हाइड्रेंट, फायर वाटर कम फोम मॉनिटर, टॉवर मॉनिटर, स्प्रिंकलर, स्मोक डिटेक्टर और फायर अलार्म सिस्टम जैसी पर्याप्त अग्निशमन सुविधाएँ उपलब्ध हैं।

पोर्ट 24x7 एम्बुलेंस और व्यावसायिक स्वास्थ्य केंद्र भी संचालित करता है, जहाँ कार्य समय के दौरान प्रमाणित कर्मियों और एक चिकित्सा अधिकारी की उपलब्धता रहती है।

KPL के पास व्यापक आपदा और संकट प्रबंधन योजना भी है, जिसके अंतर्गत कर्मचारियों को नियमित ड्रिल और कौशल विकास कार्यक्रमों के माध्यम से आपात स्थितियों के लिए प्रशिक्षित किया जाता है।


सस्टेनेबिलिटी एवं पर्यावरण

सस्टेनेबिलिटी एवं पर्यावरण का अवलोकन:

कामराजर पोर्ट लिमिटेड (KPL) टिकाऊ और जिम्मेदार पोर्ट संचालन के लिए प्रतिबद्ध है, जबकि पर्यावरणीय प्रभावों को कम करने और तटीय एवं समुद्री पारिस्थितिकी तंत्र की रक्षा करने पर विशेष ध्यान देता है। पोर्ट अपनी योजना, निर्माण और संचालन गतिविधियों में पर्यावरण प्रबंधन प्रथाओं को शामिल करता है और वैधानिक आवश्यकताओं तथा अंतरराष्ट्रीय सर्वोत्तम प्रथाओं का पालन करता है।

KPL वायु और जल गुणवत्ता, अपशिष्ट प्रबंधन, जैव विविधता संरक्षण, ऊर्जा दक्षता और जलवायु कार्रवाई से संबंधित निरंतर निगरानी और सुधार उपाय करता है। पोर्ट हरित पहल, संसाधन दक्षता और हितधारक सहभागिता को सक्रिय रूप से बढ़ावा देता है।


1. पर्यावरण नीति एवं प्रतिबद्धता

KPL टिकाऊ पोर्ट विकास और पर्यावरणीय रूप से जिम्मेदार संचालन के लिए प्रतिबद्ध है। पोर्ट तटीय और समुद्री पर्यावरण की रक्षा करने, पर्यावरणीय प्रभावों को कम करने और संसाधन-कुशल एवं जलवायु-लचीली पोर्ट अवसंरचना को बढ़ावा देने की अपनी जिम्मेदारी को पहचानता है।

KPL योजना, विकास और संचालन के सभी चरणों में पर्यावरणीय विचारों को शामिल करता है और पर्यावरणीय प्रदर्शन में निरंतर सुधार का प्रयास करता है।

नीति दस्तावेज: (यहाँ नीति दस्तावेज अपलोड करें)


2. पर्यावरण प्रबंधन प्रकोष्ठ (EMC)

KPL ने पर्यावरणीय नीतियों के प्रभावी कार्यान्वयन, वैधानिक अनुपालन और पर्यावरणीय प्रदर्शन में निरंतर सुधार सुनिश्चित करने के लिए पर्यावरण प्रबंधन प्रकोष्ठ (EMC) स्थापित किया है।

EMC पर्यावरणीय योजना, निगरानी, अनुपालन और नियामक प्राधिकरणों, पोर्ट उपयोगकर्ताओं तथा हितधारकों के साथ समन्वय के लिए नोडल इकाई के रूप में कार्य करता है।

EMC संरचना एवं पदनाम: (यहाँ संरचना दस्तावेज अपलोड करें)


3. पर्यावरण प्रबंधन योजना (EMP)

KPL ने पोर्ट विकास और संचालन गतिविधियों से उत्पन्न पर्यावरणीय प्रभावों की पहचान, निगरानी और शमन सुनिश्चित करने के लिए पर्यावरण प्रबंधन योजना (EMP) विकसित और लागू की है।

EMP प्रदूषण रोकथाम, संसाधन दक्षता, पर्यावरणीय निगरानी और पर्यावरणीय प्रदर्शन में निरंतर सुधार के लिए एक संरचित ढांचा प्रदान करता है।


4. CRZ एवं पर्यावरण स्वीकृतियाँ

KPL पर्यावरण संरक्षण अधिनियम 1986, EIA अधिसूचना 2006 (संशोधित) और CRZ अधिसूचना के प्रावधानों का पालन करते हुए पोर्ट विकास और संचालन गतिविधियाँ संचालित करता है।

पोर्ट ने अपनी अवसंरचना और विस्तार परियोजनाओं के लिए आवश्यक पर्यावरण स्वीकृति (EC) और CRZ स्वीकृति प्राप्त की है।

S.Noस्वीकृति का विवरणअनुमोदन की तिथि एवं प्राधिकरणकार्यान्वयन की स्थिति
1
2

5. पर्यावरण अनुपालन रिपोर्ट
I. अर्धवार्षिक पर्यावरण अनुपालन रिपोर्ट

KPL पर्यावरण स्वीकृति शर्तों के अनुसार MoEF&CC को अर्धवार्षिक अनुपालन रिपोर्ट प्रस्तुत करता है।

S.Noरिपोर्ट का विवरणअनुपालन अवधिMoEF&CC को प्रस्तुत करने की तिथि
1
2

6. पर्यावरण निगरानी रिपोर्ट

KPL नियमित पर्यावरण निगरानी करता है ताकि पोर्ट संचालन के प्रभाव का आकलन किया जा सके और वैधानिक आवश्यकताओं का पालन सुनिश्चित किया जा सके।

S.Noरिपोर्ट का विवरणनिगरानी अवधिTNPCB को प्रस्तुत करने की तिथि
1
2

7. ठोस एवं खतरनाक अपशिष्ट प्रबंधन

KPL पोर्ट संचालन से उत्पन्न ठोस और खतरनाक अपशिष्ट के पर्यावरणीय रूप से सुरक्षित प्रबंधन के लिए प्रतिबद्ध है।

S.Noरिटर्न का विवरणरिपोर्ट अवधिTNPCB को प्रस्तुत करने की तिथि
1
2

8. जैव विविधता प्रबंधन एवं ग्रीन बेल्ट

परियोजना क्षेत्र में विभिन्न प्रकार की स्थलीय और जलीय वनस्पतियाँ एवं जीव पाए जाते हैं। जैव विविधता संरक्षण EMP का एक महत्वपूर्ण हिस्सा है।

ग्रीन बेल्ट पोर्ट परिसर, सड़क किनारों और खुले क्षेत्रों में विकसित की गई है, जो कुल क्षेत्र का लगभग 23% (636.14 एकड़) है।


9. सस्टेनेबिलिटी रिपोर्टिंग

संगठन दीर्घकालिक आर्थिक विकास के साथ पर्यावरणीय प्रभावों को कम करने के लिए सस्टेनेबिलिटी सिद्धांतों को अपने संचालन में शामिल करने के लिए प्रतिबद्ध है।

S.Noरिपोर्ट का विवरणरिपोर्टिंग अवधिरिपोर्टिंग का प्रकार
1
2

10. पोर्ट रिसेप्शन सुविधाएँ एवं MARPOL अनुपालन

पोर्ट ने MARPOL 73/78 के अनुरूप जहाजों से उत्पन्न अपशिष्ट के सुरक्षित संग्रह और निपटान के लिए पोर्ट रिसेप्शन सुविधाएँ स्थापित की हैं।

S.Noदस्तावेज का विवरणरिपोर्टिंग का प्रकार
1
2